FLINCK / QUALITY ASSURANCE
Manufacturing & Quality Assurance
Review manufacturer credentials, test documentation and delivery requirements in one place.
Discuss your documentation needs →Manufacturer credentials
Product inspection
Choosing the documents you need
Material certificate
Review material and heat identification for the actual product.
Inspection record
Review the model, batch, test conditions and recorded results.
Qualification document
Review the documented sample, test activity and qualification scope.
Technical annex
Review construction and material details with the corresponding certificate or report.
Bellows ball valve fire-test documents6
Butterfly valve fire-test documents2
Ball valve fire-test qualifications and technical annexes29





























Globe valve fire-test documents2
Enquiry and inspection checklist
Information for your enquiry
- Fluid, composition and any solids.
- Operating and design temperatures, pressures and expected variations.
- Size, connection standard, facing and installation space.
- Operation, actuator requirements, quantity and delivery destination.
Agree inspection requirements early
- Applicable standard editions, inspection activities and acceptance criteria.
- Required report types, language and document copies.
- Any third-party witnessing, hold/witness points and notification arrangements.
- Special cleaning, protection or other order requirements.
Order technical review
Materials & traceability
Confirm body, cover, closure member and seat materials and the links between product identification, heat numbers and material records.
Shell & seat testing
Review test media, pressures, hold times, leakage criteria and results against the agreed standard and model-specific report.
Dimensions & release documents
Check size, pressure rating, flange standard, face-to-face dimensions and nameplate data, and agree the release document list.
Quality review
- 01Configuration and technical requirements
Requirements
Fluid, temperature, pressure, size, quantity and acceptance requirements.
- 02Material and traceability documents
Traceability
Check component materials, product identification and material certificates.
- 03Inspection scope and arrangements
Inspection
Agree standards, test activities and any third-party witnessing.
- 04Corresponding inspection records
Report review
Review test conditions, results, report numbers and model/batch links.
- 05Delivery review checklist
Handover
Confirm quantities, identification, packaging and delivery documents.
Linking documents to products
Packaging & delivery

01 Product protection
Agree end protection, moisture and corrosion protection.
02 Packing review
Confirm securing, quantities and shipping marks.
03 Document handover
Review the packing list and order-specific delivery documents.
Share your service conditions
Send the model, fluid, temperature, pressure, size and quantity to discuss the configuration and documentation.
Contact FLINCK →


















