What to prepare for water-system valve selection

Prepare the medium, control requirements and installation interfaces for a focused water-system valve enquiry.

Illustrative scene or construction, not a specific model or company premises

Application needs and considerations

Identify the service and medium

Raw water, circulating water and wastewater have different service conditions. When contacting FLINCK, identify the pipeline location, medium, known solids and available temperature and pressure data. Mark unknown values as unconfirmed rather than substituting estimates for design information.

Describe the required function

State whether the duty is isolation, flow control or backflow prevention, and whether manual operation or an actuator is required. For integration with a control system, provide the existing control requirements for review with the project team and supplier.

Check interfaces and installation

Prepare the connection standard, installation dimensions and maintenance access as well as nominal size. For replacements, provide the nameplate, model and dimensional drawing. Similar appearance does not establish interchangeability.

Enquiry checklist

  • Medium, installation location and required function
  • Temperature, pressure and known flow requirements
  • Size, connection standard and installation dimensions
  • Operation method, quantity and documentation requirements

This checklist helps organize an enquiry. Confirm materials, ratings and configuration against the project design and model documentation.